Kimball Office Kimball Health Kimball Learning
At Kimball Office, we are committed to providing industry leading production dependability and the best possible experience for our customers. In fact, we meet our marketed lead times on more than 90% of the furniture we ship. However, we certainly recognize the inconvenience that can be experienced by a lead time exception and, absolutely, want you to know that we do everything possible to get our product to you as quickly as we can.
Lead Times current as of: Thu Jun 29 05:03 AM 2017


PRODUCT GROUPPRODUCT SERIESLEADTIMENOTES
CASEGOODS ACCESSORY-CG 3-4 WEEKS
ASPIRE® 3-4 WEEKS
BLOOM® 3-4 WEEKS
BOOKCASE 3-4 WEEKS
COLLECTIONS 3-4 WEEKS
CONFERENCING SOLUTION 3-4 WEEKS
DEFINITION® 3-4 WEEKS
DOCK® CONFERENCE/OCCASIONAL 3-4 WEEKS
DOCK® TRAINING/MULTIPURPOSE 3-4 WEEKS
FLUENT™ 4-5 WEEKS
GUIDE™ 3-4 WEEKS
INNSBRUCK™ 3-4 WEEKS
KORE™ 4-5 WEEKS
Hinged Lid Carts9-10 WEEKS
MASCOT™ 4-5 WEEKS
OVERBED TABLES 6-7 WEEKS
PRESIDENT™ 3-4 WEEKS
PRIORITY™ BENCHING LAMINATE 4-5 WEEKS
Enhancements4-5 WEEKS
PRIORITY™ BENCHING VENEER/SUPPORT 3-4 WEEKS
Enhancements4-5 WEEKS
PRIORITY™ HEIGHT ADJUSTABLE 3-4 WEEKS
PRIORITY™ LAMINATE 4-5 WEEKS
Enhancements4-5 WEEKS
PRIORITY™ VENEER 3-4 WEEKS
Enhancements4-5 WEEKS
SANCTUARY™ 4-5 WEEKS
SCENARIO™ 3-4 WEEKS
SENATOR™ 3-4 WEEKS
STOW™ STORAGE/WALL PANELS 4-5 WEEKS
TEEM® MEDIA CABINET 3-4 WEEKS
TRANSCEND® 3-4 WEEKS
UNIVERSAL LATERAL FILING 3-4 WEEKS
SYSTEMS ACCESSORY 3-4 WEEKS
CETRA™ 3-4 WEEKS
FOOTPRINT® STORAGE 3-4 WEEKS
FOOTPRINT® STORAGE LAMINATE 4-5 WEEKS
FOOTPRINT® STORAGE METAL/PAINT 3-4 WEEKS
FOOTPRINT® STORAGE VENEER 4-5 WEEKS
FOOTPRINT® SUPPORT 3-4 WEEKS
FOOTPRINT® SUPPORT LAMINATE 3-4 WEEKS
FOOTPRINT® SUPPORT METAL/PAINT 3-4 WEEKS
FOOTPRINT® SUPPORT VENEER 3-4 WEEKS
FOOTPRINT® WORKSURFACE 3-4 WEEKS
FOOTPRINT® WORKSURFACE LAMINATE 3-4 WEEKS
FOOTPRINT® WORKSURFACE METAL/PAINT 3-4 WEEKS
FOOTPRINT® WORKSURFACE VENEER 3-4 WEEKS
INTERWORKS® EQ 3-4 WEEKS
NARRATE™ 7-8 WEEKS
TRAXX® / TILES 3-4 WEEKS
XSEDE® ADJUSTABLE HEIGHT SURF/BASE, LAM 4-5 WEEKS
XSEDE® ADJUSTABLE HEIGHT SURF/BASE, MET 4-5 WEEKS
XSEDE® ADJUSTABLE HEIGHT SURF/BASE, VEN 4-5 WEEKS
XSEDE® ELECTRICAL/ACCESSORIES 3-4 WEEKS
XSEDE® SUPPORT/LEGS/METAL TILES 3-4 WEEKS
XSEDE® WORKSURFACE/SUPPORT 3-4 WEEKS
XSITE® 3-4 WEEKS
SYSTEMS KWIK OFFICE ACCESSORY 11 DAYS
FOOTPRINT® STORAGE 11 DAYS
FOOTPRINT® STORAGE METAL/PAINT 15 DAYS
FOOTPRINT® SUPPORT 15 DAYS
FOOTPRINT® SUPPORT METAL/PAINT 15 DAYS
INTERWORKS® EQ 15 DAYS
TRAXX® / TILES 11 DAYS
FILES FUNDAMENTAL® 3-4 WEEKS
LF™ SERIES 3-4 WEEKS
FILES KWIK OFFICE FUNDAMENTAL® 15 DAYS
LF™ SERIES 15 DAYS
UNIVERSAL JOLT™ 3-4 WEEKS
PERKS® 3-4 WEEKS
UNIVERSAL KWIK OFFICE PERKS® 37 DAYS
HYBRID Hum. Minds at Work.® 3-4 WEEKS
SEATING ABBOTT™ 3-4 WEEKS
ACAPELLA® 3-4 WEEKS
ACCENT PILLOW 3-4 WEEKS
ADAGIATO® 3-4 WEEKS
ALPINE™ 4-5 WEEKS
ALUMMA® 3-4 WEEKS
ARPEGGIO™ 3-4 WEEKS
BEO® 3-4 WEEKS
BINGO® 1-2 WEEKS
K50NA3-4 WEEKS
K50NW3-4 WEEKS
BLOOM® 3-4 WEEKS
BOYD® 3-4 WEEKS
CAMPOS™ 3-4 WEEKS
CARRINGTON™ 3-4 WEEKS
CLAIRMONT™ 3-4 WEEKS
COLLAGE™ 3-4 WEEKS
CRESCENT™ / VISTA™ 3-4 WEEKS
DELANO™ 3-4 WEEKS
DWELL™ 3-4 WEEKS
ENJOY™ 3-4 WEEKS
EVENT™ 3-4 WEEKS
EXAM STOOL 3-4 WEEKS
FLIP® 3-4 WEEKS
K76BMUC14-5 WEEKS
K76BMUC44-5 WEEKS
INDEPENDENCE™ 3-4 WEEKS
INNSBRUCK™/OSTERLEY PARK™ 10-11 WEEKS
ITSA™ 3-4 WEEKS
JOYA™ 3-4 WEEKS
K56TMUCFFA5-6 WEEKS
LUSSO™ 3-4 WEEKS
MEADOW™ 4-5 WEEKS
MUIRFIELD™ 3-4 WEEKS
NASH™ 3-4 WEEKS
PAIRINGS® 3-4 WEEKS
3D Laminate, HPL & Veneer Caps & Tablets4-5 WEEKS
With Solid Surface5-6 WEEKS
With Storage Arms8-9 WEEKS
POLY™ 1-2 WEEKS
POSE™ 3-4 WEEKS
SHORE® 3-4 WEEKS
SPLENDOR™ 3-4 WEEKS
SPRUCE™ 4-5 WEEKS
STATURE® 3-4 WEEKS
SYCAMORE™ 4-5 WEEKS
THEO™ 8-9 WEEKS
TUCKER™ 3-4 WEEKS
VILLA™ 3-4 WEEKS (see notes)
WISH™ 3-4 WEEKS
WREN™ 1-2 WEEKS
XTREME™ 3-4 WEEKS
SEATING KWIK OFFICE ACAPELLA® 6 DAYS
ALUMMA® 6 DAYS
BEO® 6 DAYS
BINGO® 6 DAYS
K50NA3-4 WEEKS
K50NW3-4 WEEKS
CAMPOS™ 6 DAYS
COLLAGE™ 6 DAYS
EVENT™ 6 DAYS
HERO.JUST FOR YOU.™ 6 DAYS
ITSA™ 6 DAYS
JOYA™ 8 DAYS
K56TMUCFFA5-6 WEEKS
MUIRFIELD™ 6 DAYS
POLY™ 6 DAYS
POSE™ 6 DAYS
STATURE® 6 DAYS
WISH™ 6 DAYS
INTERSTUHL HERO.JUST FOR YOU.™ 9-10 WEEKS

Lead Time Notes

TFL orders in the following laminate colors could experience extended
lead time: Canyon Oak, Monterey Oak, Midtown Walnut, Tuscan Walnut and
Amber Cherry.
Kwik Office seating is pacing 6-8 days.
Kwik Office casegoods and tables are transitioning to a 10 day lead
time.
Villa tables in Tuscan Walnut, Canyon Oak and Montery Oak are
experiencing 5 week lead times.
Villa lead time listed above includes Villa Health Lounge.
Villa Health models with either 3D laminate or solid surface arm cap
options have a 4-6 week lead time.
Villa Sleep Sofa lead time is 4-6 weeks.
Sapele and Zebrawood finishes are experiencing extended lead times